CDM 2015 created the role of principal designer, and under the regulations, this duty holder is responsible for managing health and safety during the pre-construction phase. What information should a principal designer provide to comply with the regulations?

What CDM 2015 Information Should A Principal Designer Provide? header image

CDM 2015 created the role of principal designer, and under the Regulations, this duty holder is responsible for managing health and safety during the pre-construction phase. What information should a principal designer provide to comply with the regulations?

Firstly, the principal designer role is about more that just supplying information, but the communication of information to other duty holders on the project is a key duty.

At the start of the project, the principal designer should provide the client with information on their skills, knowledge, training and experience, and how they will fulfil the role.

The principal designer has some big responsibilities regarding two of the three main CDM documents:

It is the principal designers role to provide advise the the client about the information required for the pre-construction information, and to provide this information to all designers, and to the principal contractor.

The principal designer will also need to structure, format, and gather the required content for the health and safety file, and provide this to the client at the end of the project.

The principal designer is responsible for coordinating health and safety information at the pre-construction phase.

Part of this responsibility will include sharing pre-construction information such as surveys, drawings, services, and any other relevant information between designers.

Information on the proposed expectations, methods of communication, circulation or information and attendance at meetings should be shared with the team throughout the pre-construction phase.

The principal designer acts as the key point of contact for sharing information between the design team.

Any issues with health and safety, remaining risks, design changes, or further information gathered will need to be responded to by the principal designer, including answering any questions or queries.

The principal designer can update the client on progress, status of information gathering and feedback on any significant health and safety issues.

During the construction phase of the project, the principal designer will have handed over the pre-construction information to the principal contractor, as well as information on what will be required for finalising the health and safety file.

The principal designer will also need to pass on information in response to any queries or questions regarding the design that may arise.

On completion, the principal designer is responsible for handing over the finished health and safety file to the client, or, if the appointment finished prior to completion, they will provide the information to the principal contractor.

share on twitter share on facebook share on linked in share by email

This article was written by Emma at HASpod. Emma has over 10 years experience in health and safety and BSc (Hons) Construction Management. She is NEBOSH qualified and Tech IOSH.

Need CDM Help?

Get CDM support on your construction projects with our free guides and support packs for all duty holders.

CDM Support

Recent posts like this...

CDM 2015 Roles And Responsibilities image

CDM 2015 Roles And Responsibilities

The roles of client, principal designer, principal contractor, designers and contractors all have responsibilities under CDM. And so do workers. In this blog post, we will look at what these roles are, when they apply, and what you need to do.

Read Post
What Is Pre-Construction Information? image

What Is Pre-Construction Information?

Pre-construction information is one of the first health and safety documents you will need on a construction project. This is a legally required document, required by the CDM regulations for every construction project.

Read Post
25 CDM Regulation Questions Answered (FAQs) image

25 CDM Regulation Questions Answered (FAQs)

In this CDM FAQ, we've answered 25 of the most commonly asked questions about CDM. Along the way, you’ll find examples, resources, and tools to help you comply with CDM on your construction projects.

Read Post

Spend less time on paperwork.
Start with the free plan today.